At its peak, over 100 Wiremen helped to put this facility together in 15 short months. MMC was recognized for Excellence in Construction by NECA/IBEW for our efforts. The project includes 200 hotel rooms, an 85,000 sf casino gaming floor, four restaurants, 25,000 sf of event space and all kitchen/food service/office and administration spaces. Our efforts reduced the construction time of an already aggressive construction schedule. Modeling included all underground and overhead pathways, light fixtures and support in addition to lightning protection system, under-floor distribution and emergency and paralleling gear. Our BIM modeling started before the construction drawings were completed. Our design-assist efforts resulted in the elimination of unnecessary electrical equipment, fixture list revisions and workspace reorganization which resulted in significant cost savings to the owner. MMC was engaged during the conceptual design phase of this6-story hotel/spa/casino facility to perform document reviews and provide value engineering services in advance of the installation of the electrical systems.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |